Member Center

UL Fletcher Hall Renovation

News Articles

Posted 3:31 PM 12/19/2012 : Fletcher Hall Renovations Planned to Address Water Damage

The University of Louisiana at Lafayette is planning renovations to Joel L. Fletcher Hall to remediate water damage that has been a problem since it was constructed in the 1970s.

Fletcher Hall was designed to have a glass-covered atrium but due to budget restraints, it was built with an

Posted 7:33 PM 12/13/2012 : UL Students have Mixed Feelings about Fletcher Hall Renovation

UL students, alumni and faculty have mixed feeling about the emergency facelift planned for Fletcher Hall. There's even a Facebook page to save the building. Years of maintenance problems have caused it to deteriorate.

Fletcher Hall has suffered extensive water damage since it opened

Recent Videos

KATC.com is Social!

KATC Videos

Mamou Elementary LEAP Test Issues